The company announced in early May that the Hugo extension reached level 382 as planned, and intersected the Farellón system at level 395, 13 meters deeper than previously drilled. Drilling will

continue to the northeast and southwest on both levels. Thus, Altiplano was successful in its campaign to reach lower gold-copper mineralization at the property located in the Fourth Region. 

Work on the Hugo extension

Deja una respuesta

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *