• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar

Chile Explore Group

The premier independent and authoritative information source about the Chile exploration sector

  • EspañolEspañol
  • EnglishEnglish
  • Chile Explore Report
  • News
  • Project Showcase
  • Chile Explore Congress
  • Events
    • GEOLOGY FOR NON-GEOLOGISTS
  • About
  • Contact

Available Exploration Alliance Area: Montevideo

13 February, 2020 By chilexploregroup Leave a Comment

Project with potential Fe-Cu (Au)

The Montevideo Project is located in Region I, 30km east of Iquique and 12km west of Pozo Almonte, adjacent to the La Tirana Mine, which has two operating banks along a N80E main fault. The area was identified by exploration in the framework of a program with Au interest in sectors of old activities. In an area of ​​2km per 1km different samples were found with mineralization of Fe oxides (magnetite, specularite, etc.), subordinate copper oxides and crystalline quartz veins, which have two types of mineralization (massive veins and lenticular bodies) related to structures with a width that oscillates between 0.5 and 2 meters. Approximately 50% of the area is covered, but it stands out for the strong structural control N80E (trend mineralizer), where it is possible to discontinuously identify the main structure over several kilometers. This project has geological mapping and geochemical sampling in old trenches and recently recognized structures during field mapping, has ICP and Au analysis (with values ​​ranging between 15 and 30% Fe, between 0.5 and 2% CuS and as by-product anomalies of Au). All of the above within the SQM concessions in the sector (greater than 1,000 hectares)

In lithology aspects, the geology of Montevideo is characterized by marine sequences represented mainly by Upper Jurassic limestone (Fm Santa Rosa) and Lower Cretaceous intrusive represented by granites, monzonites and granodiorites (Montevideo Intrusive Complex).

The current model of this project is a vein type system with economic interest values ​​of Fe-Cu-Au (IOCG?), With favorable covered areas to intercept structures with new mineralizing volumes of great geological potential. Finally, it is important to note that a large part of the work was concentrated in mineralized areas and with structural evidence, where drilling targets have been defined that allow validating structural models with great economic potential.

This project has easy access, is 8km from the 16-Norte highway (Iquique-Ruta 5 Norte) and is approximately 12 km west of Pozo Almonte. It comprises a total area greater than 600 hectares.

 

Jose Dias Cifuentes                                                 Ricardo Gonzalez Montecinos

Metal Business Development Geologist              Exploration and Metal Business Development Manager 

Jose.dias.cifuentes@sqm.com                              ricardo.gonzalez.montecinos@sqm.com

+56 9 7465 7359                                                       +56 9 6320 7257

Filed Under: ps-eng

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

UPCOMING EVENTS

There are no upcoming events.

News

Austral Gold outsources operations in Amancaya and Guanaco

Cerro Grande regains control of Pimentón

Latin Metals and Patagonia Gold Agree Terms for Acquisition of Mina Angela Project, Chubut Province

My account

 

Copyright © 2021 Chile Explore Group · Santiago de Chile