New drilling confirms an extension to the “superpod” mineralization identified in the underground extension area of the Pilar mine. The main exploration results include 22.8m @ 3.18% Cu, including 10.6m @ 5.29% Cu, and 21.8m @ 2.27% Cu, including 2.8m @ 7.76% Cu. The mineral intersections in the Pilar underground extension area are now 800m long and 400m deep below the current level of the main ramp. Ero Copper expects the mineralization strip to remain open to the north and at greater depth.

Deja una respuesta

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *