2021 drill program at Oko, compared to 2020 results

Assay results from four of the 16 holes drilled since March at the 19,200-acre Oko project run by G2 Goldfields Inc. (TSXV: GTWO) have defined at least five distinct mineralized shear zones within a 900m-long mineralized envelope.

Assay highlights include:

  • 5m @ 15.3g/t Au and 11.3m @ 9.25g/t Au from holes 66 and 67, 70m apart, at Shear #5
  • 7 m @ 10.5g/t Au and 3.8m @ 10.2g/t Au from holes 54 (August 2020) and 68, 50m apart, at Shear #3.

Deja una respuesta

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *