TESORO EXTENDS TERNERA DEPOSIT 150M TO EAST

Share This Post

Hole 125 extends the MF500 fault 50m to the south and extends the Ternera Deposit 150m to the east.

Extensional and infill drilling at the El Zorro gold project, operated by Tesoro Resources (ASX: TSO), confirmed a 150m eastward extension of the Ternera target.

The mineralised system at Ternera is now >1km in strike length, >500m wide and has been drilled to >400m below surface. To date, four strike extensive high-grade zones have been delineated at Ternera, each >600m in strike, with mineralisation starting at surface to >300m vertically below surface. The system remains open in all directions.

Of note was hole 124, which returned 71m @ 1.63g/t Au (116g/m), starting at 152m depth, and hole 125, which intercepted 52.00m @ 1.37g/t Au from 316.5m depth.

Tesoro has now completed 179 drillholes at El Zorro for 55,724m. Assays are pending for 46 holes.

Subscribe To Our Newsletter

Get updates and learn from the best

More To Explore

Do You Want To Boost Your Business?

drop us a line and keep in touch

Learn how we helped 100 top brands gain success.

Let's have a chat