While the first drill rig currently at San Francisco de Los Andes will remain at the breccia pipe, the second rig will drill one hole at SFdLA before commencing exploration drilling of newly discovered gold-copper-silver mineralised breccia pipes, with approximately 2500 meters of drilling planned to test for extensions to the high-grade mineralization encountered in the first phase of drilling completed by the Company in 2019.  The 

2019 drill results included 36.95m @ 6.31 g/t Au, 122 g/t Ag & 0.88% Cu, 85.30m @ 4.43 g/t Au, 109 g/t Ag & 0.79% Cu and 26.75m @ 5.47 g/t Au, 97 g/t Ag & 3.30% Cu. The first holes of the current program test 60 to 80 meters below the deepest holes drilled by Turmalina to date. Further holes will then extend this to greater depths as well as test shallower lateral extensions.

Deja una respuesta

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *